Himachal Pradesh is one of those states of India, which quickly grew to become from the country’s most backward States to one of the most progressive states. Presently, Himachal ranks fourth compared to the per capita profits among the Indian Union states. The rapid development of Himachal Pradesh has attracted many startups and entrepreneurs to start their businesses in the state. The nation has also attracted investments in the sectors, even in pharmaceutical, IT, and engineering industries. 

Because the Himachal dirt-free weather is extremely appropriate for the advent of electronic industries, many electronic complexes were established in the state. With 5 perennial rivers flowing through the nation, Himachal Pradesh has the potential to make contributions to 26% of India's hydroelectric ability. 

The state has a predicted hydroelectric ability of over 23,000 MW. The Baddi Barotiwala Nalagarh commercial belt developed as a key manufacturing center for startups and is predicted that the area is the largest drug manufacturing location in Asia. 

Himachal Pradesh is recognized for its scenic beauty and the advent of national tourism ought to grow through 5.90% of the CAGR. The authorities also advanced the adequate infrastructure for the development of tourism that includes a provision of public offerings, roads, communique networks, airports, shipping services, water supply, and civic offerings, amongst others.


Growing Key Sectors For Startups To Start Their Businesses: 

·         With satisfactory agro-climatic situations, Himachal Pradesh has generated the importance of industrial crops, inclusive of low seasonal greens, potatoes, and ginger. The agriculture sector is the main profession of the state and has inspired many entrepreneurs to start some of the most profitable agriculture businesses. To grow the manufacturing of meals grains, the emphasis has been set up on the distribution of excessive-overall performance range seeds to farmers. 

 

·         Apart from agriculture, one of the most thriving industries in Himachal Pradesh is the pharmaceutical industry. It has been noticed that the pharmaceutical industry of the state is one of the fastest-growing industries. The state government also encourages the industry to attract new startups within the state. In FY20, the exports of formulations of Himachal Pradesh and biological drug addicts had been placed at US $ 822.0 million and touched US $ 814.39 million in a monetary period of 12 months. 

 

·         Another booming sector for the state is the Tourism sector. The tourism industry of Himachal Pradesh brings a high profit to the business of the states. The sector alone contributes 7% of the total GDP. The internal visitor entrance inside the state reached 16.83 million in 2019, even as the number of overseas vacationers reached 383,000. 

 

·         Himachal Pradesh made sizable effects within the area of industrialization in recent years. The rich herbal sources of the state are correctly appropriate for investments in the primary sectors, along with the purchase of agricultural merchandise, hydroelectric energy, cement, and tourism. Himachal Pradesh made good sized effects in the area of industrialization in recent years. 

 

To provide support to the employers' infrastructure, the officials of Himachal Pradesh have advanced 41 commercial areas and 15 industrial estates. Solan, Sirmour, Kangra, and Una districts are on the top in terms of investments attracted. The Rohtang tunnel, which was recently inaugurated, for a 9.02 km period, passing through the Rohtang bypass, is the longest avenue tunnel in the world, linking Manali with the Lahaul Spiti valley. Making it easy for businesses to connect.

 

Entrepreneur India’s studies significantly cover Indian markets, contemporary analysis, outlook, and forecast. The market forecasts are evolved based totally on secondary studies and are converted through interactions with industry players. The team uses reliable facts and database resources and the information of these assets are processed by professionals and covered inside every project report. The project reports permit an entrepreneur to understand the profitability of the mission through revealing info as raw substances required, production manner, undertaking fees, and snapshots of other economic functions of the project.

AK_20Art21

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Manufacturing of Hand Sanitizer
Manufacturing of Hand Sanitizer

Manufacturing of Hand Sanitizer. Emerging Business Investment Opportunities in Produc... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Herbal Ayurvedic Hand Sanitizer
Production of Herbal Ayurvedic Hand Sanitizer

Production of Herbal Ayurvedic Hand Sanitizer. Startup Business Investment in Disinfectant Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Gold and Diamond Jewellery
Gold and Diamond Jewellery

Jewellery may be made from a wide range of materials. Gemstones and similar materials such as amber and coral, p... Read More

Capacity : Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day
Plant and Machinery cost: 270.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 2504.00Lakhs
Add To Inquiry Basket
Skill Development Centre
Skill Development Centre
The role of education in facilitating social and economic progress has long been recognized. Education improves functional and analytical ability and ... Read More
Capacity : Engineering Graduates: 250 Students / Batch Supervisory & Workmen Cadre: 250 Students / Batch Each B
Plant and Machinery cost: 291.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):15.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 1228.00Lakhs
Add To Inquiry Basket
Graphite Crucible
Graphite Crucible
Graphite crucible can withstand the high temperature, and has good resistance to chemical erosions and thermal shock. Especially graphite crucible is ... Read More
Capacity : Graphite Crucible (10 Kgs each): 800 Pcs/day
Plant and Machinery cost: 267.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):27.00 %
TCI :0.00 Lakhs
Cost of Project : 1034.00Lakhs
Add To Inquiry Basket
Hand Sanitizer
Hand Sanitizer
Hand sanitizers that do not contain alcohol usually contain benzalkonium chloride instead. They kill bacteria by disrupting their membranes, but we st... Read More
Capacity : Hand Sanitizer (50 ml size Bolltes):10,000 Bottles/day
Plant and Machinery cost: 16.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 156.00Lakhs
Add To Inquiry Basket
Particle Board from Wheat/Rice Straw
Particle Board from Wheat/Rice Straw
Agricultural waste or residue is made up of organic compounds from organic sources such as rice straw, wheat straw, oil palm empty fruit bunch, sugar ... Read More
Capacity : Particle Board (Size 6x3x0.471') : 5,000,000.0 Sq.Mtrs. / Annum
Plant and Machinery cost: 335.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 930.00Lakhs
Add To Inquiry Basket
Porcelain Insulators
Porcelain Insulators

An electrical insulator is a material whose internal electric charges do not flow freely, and therefore make it ... Read More

Capacity : Porcelain Insulators : 500.0 MT / day
Plant and Machinery cost: 695.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 2804.00Lakhs
Add To Inquiry Basket
Methanol from Bio-Waste
Methanol from Bio-Waste

Methanol is a clean burning drop in fuel which can replace both petrol & diesel in transportation & LPG,... Read More

Capacity : Methanol from Biowaste:100.0 MT / day
Plant and Machinery cost: 28700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):9.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 32721.00Lakhs
Add To Inquiry Basket
2nd Revised Edition of The Complete Book on Printing Technology
2nd Revised Edition of The Complete Book on Printing Technology

 

2nd Revised Edition of The Complete Book on Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Ideas and Opportunities in Graphite Crucible
Business Ideas and Opportunities in Graphite Crucible

 

Business Ideas and Opportunities in Graphi... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing Opportunities in Disposable Nitrile Gloves
Manufacturing Opportunities in Disposable Nitrile Gloves

Manufacturing Opportunities in Disposable Nitrile Gloves. The Most Profitable Industry to Lau... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of A4 and A3 Size Paper
Production of A4 and A3 Size Paper

 

Production of A4 and A3 Size Paper. Profitab... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Investment Opportunities L-ASCORBIC ACID (PLAIN)
Investment Opportunities L-ASCORBIC ACID (PLAIN)

 

Investment Opportunities L-ASCORBIC ACID (... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Your Own Industry with Investment of 2.5 Crores
Start Your Own Industry with Investment of 2.5 Crores

Start Your Own Industry with Investment of 2.5 Crores (Plant and Machinery). Most Suc... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Battery Sprayer
Battery Sprayer

A sprayer is a device used to spray a liquid, where sprayers are commonly used for projection of water, weed kil... Read More

Capacity : 400 Pcs per day
Plant and Machinery cost: 16.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):73.00 %
TCI :0.00 Lakhs
Cost of Project : 110.00Lakhs
Add To Inquiry Basket
Lemon-Lime Flavoured Soft Drink  (Nimbu Pani)
Lemon-Lime Flavoured Soft Drink (Nimbu Pani)

Soft drinks include all drinks made from water or mineral water, sugar, aromas, and essences, and usually contain carb... Read More

Capacity : 50000 Bottles per day
Plant and Machinery cost: 98.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 700.00Lakhs
Add To Inquiry Basket
Condoms
Condoms

A condom is a thin, fitted tube. Condoms prevent pregnancies and STDs. They create a barrier that keeps semen an... Read More

Capacity : 500 Boxes per day
Plant and Machinery cost: 965.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1963.00Lakhs
Add To Inquiry Basket
Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Products.
Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Products.

Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Produc... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Bio-Based and Biodegradable Plastics Production
Bio-Based and Biodegradable Plastics Production

Bio-Based and Biodegradable Plastics Production. Profitable Business Ideas on Biodegr... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Idea of Double Edge Razor Blade Manufacturing
Business Idea of Double Edge Razor Blade Manufacturing

Business Idea of Double Edge Razor Blade Manufacturing. Production of Doubl... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Biodegradable Sanitary Pad/Napkin Industry
Biodegradable Sanitary Pad/Napkin Industry

Biodegradable Sanitary Pad/Napkin Industry. Production of Compostable and Eco Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Biodegradable Sanitary Pad/Napkin Industry.
Biodegradable Sanitary Pad/Napkin Industry.

Biodegradable Sanitary Pad/Napkin Industry. Production of Compostable and Eco Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing of Lemon-Lime Flavoured Soft Drink (Nimbu Pani) with Lemon Juice
Manufacturing of Lemon-Lime Flavoured Soft Drink (Nimbu Pani) with Lemon Juice

Manufacturing of Lemon-Lime Flavoured Soft Drink (Nimbu Pani) with Lemon Juice. Profitable Bu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Startup Business Opportunities in Sorbitol
Startup Business Opportunities in Sorbitol

Startup Business Opportunities in Sorbitol. Manufacturing of Sorbitol. Start Profitable Busin... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing of Pig Iron. Investment Opportunity in Steel and Iron Sector.
Manufacturing of Pig Iron. Investment Opportunity in Steel and Iron Sector.

Manufacturing of Pig Iron. Investment Opportunity in Steel and Iron Sector.<... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Biomass Briquettes from Bio Waste
Biomass Briquettes from Bio Waste

Among the non-conventional forms of energy, Bio-Energy offers vast potential under Indian conditions, due to the wide ... Read More

Capacity : 20 MT per day
Plant and Machinery cost: 52.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):73.00 %
TCI :0.00 Lakhs
Cost of Project : 94.00Lakhs
Add To Inquiry Basket
Caustic Soda from Limestone and Sodium Carbonate (Soda Ash)
Caustic Soda from Limestone and Sodium Carbonate (Soda Ash)

Sodium hydroxide, also known as lye and cau... Read More

Capacity : Caustic Soda from Limestone and Sodium Carbonate: 60 MT per day
Plant and Machinery cost: 171.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 827.00Lakhs
Add To Inquiry Basket
A Business Plan For Sanitary Napkins
A Business Plan For Sanitary Napkins

A sanitary napkin, also kno... Read More

Capacity : Sanitary Napkins 4,800 PKTS per day
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Blood Collection Tubes (Vacutainer)
Start Manufacturing Of Blood Collection Tubes (Vacutainer)

Blood collection tubes, also known as Vacutainer, are essential tools used in the med... Read More

Capacity : -
Plant and Machinery cost: 464.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 985.00Lakhs
Add To Inquiry Basket
Start Production Of Potato Flakes
Start Production Of Potato Flakes

Capacity : Potato Flakes 2 MT Per Day
Plant and Machinery cost: 178.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 563.00Lakhs
Add To Inquiry Basket
Setup Manufacturing Unit Of Bicycle Saddle & Pedals
Setup Manufacturing Unit Of Bicycle Saddle & Pedals

Bicycle saddles and pedals are two crucial components that di... Read More

Capacity : Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day
Plant and Machinery cost: 208.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 575.00Lakhs
Add To Inquiry Basket
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda

Sodium Sulfide Flakes, scie... Read More

Capacity : Sodium Sulfide Flakes 10,000 MT Per Annum
Plant and Machinery cost: 282.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Business Plan for Lithium Ion Battery (Battery Assembly)
Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion battery (Battery Assembly) is a rechargeable battery that is typically ... Read More

Capacity : -
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 812.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Steel Containers (Cargo Containers)
Start Manufacturing Business of Steel Containers (Cargo Containers)


Read More

Capacity : Cargo Containers (Size 20 Feet) 34 Nos Per Day
Plant and Machinery cost: 272.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1992.00Lakhs
Add To Inquiry Basket
Start Cutting and Grinding Disc Business
Start Cutting and Grinding Disc Business

 

Cutting and grind... Read More

Capacity : Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day
Plant and Machinery cost: 141.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 423.00Lakhs
Add To Inquiry Basket
Mink Blankets Production
Mink Blankets Production

 

Mink blankets, de... Read More

Capacity : -
Plant and Machinery cost: 2700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 6000.00Lakhs
Add To Inquiry Basket
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)

 

Micronutrient For... Read More

Capacity : Micronutrient Fortified Energy Dense Food 100 MT Per Day
Plant and Machinery cost: 1300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 3500.00Lakhs
Add To Inquiry Basket
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)


Read More

Capacity : -
Plant and Machinery cost: 29000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):33.00 %
TCI :0.00 Lakhs
Cost of Project : 56500.00Lakhs
Add To Inquiry Basket
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)

Crumb Rubber Powder represents a finely milled material produ... Read More

Capacity : Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day
Plant and Machinery cost: 97.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 303.00Lakhs
Add To Inquiry Basket
Start a Production Of Compressed Biogas
Start a Production Of Compressed Biogas

Compressed bio gas (CBG) is a renewable energy source produced from organic material such as agricultural... Read More

Capacity : Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 522.00Lakhs
Add To Inquiry Basket
Start Industry Of Craft Beer
Start Industry Of Craft Beer

Craft beer is a term used to describe a beer that has been made in a traditional and independent fashion. It is usually made in smaller batches wit... Read More

Capacity : Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot
Plant and Machinery cost: 780.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 2007.00Lakhs
Add To Inquiry Basket
Setup plant of  Acetate Tow  for Cigarette Filters
Setup plant of Acetate Tow for Cigarette Filters

Acetate tow is a type of material used in the cigarette industry to make filters. It is made of cellulose acet... Read More

Capacity : Acetate Tow 8 MT Per Day
Plant and Machinery cost: 542.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Setup Plant  Of Titanium Dioxide From Rutile Ilmenite Ore
Setup Plant Of Titanium Dioxide From Rutile Ilmenite Ore

Titanium dioxide from rutil... Read More

Capacity : Titanium Dioxide 4 MT Per Day
Plant and Machinery cost: 390.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 1455.00Lakhs
Add To Inquiry Basket
Setup Plant Of  Lab Cultured Diamonds From Graphite
Setup Plant Of Lab Cultured Diamonds From Graphite

Lab-cultured diamonds are quickly becoming the new standard for luxury jewelry, offering many of the same qualities as trad... Read More

Capacity : Lab Cultured Diamonds (1 Carat) 30 Carat Per Day
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 361.00Lakhs
Add To Inquiry Basket
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)

Lemon processing is the pro... Read More

Capacity : Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs
Plant and Machinery cost: 163.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Solar PV (Photovoltaic) Glass Industry Manufacturing Business
Solar PV (Photovoltaic) Glass Industry Manufacturing Business

The global energy transition towards renewable sources is well underway, and solar po... Read More

Capacity : Solar PV (Photovoltaic) Glass 90,000 MT Per Annum
Plant and Machinery cost: 2800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):69.00 %
TCI :0.00 Lakhs
Cost of Project : 4200.00Lakhs
Add To Inquiry Basket
A Business Plan For Pea Protein Isolate or Concentrate
A Business Plan For Pea Protein Isolate or Concentrate

Yellow peas are the source of the pea protein isolate and concentrate. These goods of... Read More

Capacity : Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day
Plant and Machinery cost: 118.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 614.00Lakhs
Add To Inquiry Basket
Setup Plant  Of  Acrylate Resins and Emulsions
Setup Plant Of Acrylate Resins and Emulsions

An important class of materials that have acquired extensive application in numerous ... Read More

Capacity : Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum
Plant and Machinery cost: 500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 2291.00Lakhs
Add To Inquiry Basket
Start Latex Rubber Thread Manufacturing Business
Start Latex Rubber Thread Manufacturing Business

A sort of elastic material created from either natural rubber... Read More

Capacity : Latex Rubber Thread 200 Kg. Per Day
Plant and Machinery cost: 145.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 412.00Lakhs
Add To Inquiry Basket
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business

Serum, cream, shampoo, and lipstick are frequently seen in cosmetic units, which are ... Read More

Capacity : -
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):37.00 %
TCI :0.00 Lakhs
Cost of Project : 1617.00Lakhs
Add To Inquiry Basket
Pioneering Pea Protein Building a Successful Business Venture
Pioneering Pea Protein Building a Successful Business Venture

Healthy protein powder called pea healthy protein isolate/con... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production Of Silica  From Rice Husk Ash
Start Production Of Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and oxygen, and is one of the most a... Read More

Capacity : -
Plant and Machinery cost: 2995.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 4716.00Lakhs
Add To Inquiry Basket
A Business Plan for IV Fluid (BFS Technology)
A Business Plan for IV Fluid (BFS Technology)

 

IV fluids, also k... Read More

Capacity : IV Fluids (500 ml Size Pack) 78,000 Packs Per Day
Plant and Machinery cost: 744.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1263.00Lakhs
Add To Inquiry Basket
Start Industry of Liquor from Mahua (Wine and Hard Liquor)
Start Industry of Liquor from Mahua (Wine and Hard Liquor)

Mahua is a tropical tree native to the Indian subcontinent and Southeast Asia. It is ... Read More

Capacity : Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B
Plant and Machinery cost: 782.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 1880.00Lakhs
Add To Inquiry Basket
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant

 

Pharmaceutical unit tablets and capsules are c... Read More

Capacity : -
Plant and Machinery cost: 179.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):29.00 %
TCI :0.00 Lakhs
Cost of Project : 35774.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo

Why The Beauty Indu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Unit Of Cement Plant with Power Generation
Setup Unit Of Cement Plant with Power Generation

Cement is a crucial binding agent that is use... Read More

Capacity : Cement Plant 40,000 Bags per Day
Plant and Machinery cost: 16500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 25200.00Lakhs
Add To Inquiry Basket
A Business Plan for Sterile Water for Injection
A Business Plan for Sterile Water for Injection

Sterile water refers to water that is completely free from any living organisms, such... Read More

Capacity : Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day
Plant and Machinery cost: 572.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 1234.00Lakhs
Add To Inquiry Basket
Setup Plant Of Lead From Galena
Setup Plant Of Lead From Galena

Lead is a heavy metal that is commonly found in the earth's crust. Its abundance, low... Read More

Capacity : Lead Ingot 30 MT Per Day
Plant and Machinery cost: 487.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2231.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manufacturing of Hand San... 0 0.00 0.00
Production of Herbal Ayur... 0 0.00 0.00
Gold and Diamond Jeweller... Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day 34.00 2504.00
Skill Development Centre Engineering Graduates: 250 Students / Batch Supervisory & Workmen Cadre: 250 Students / Batch Each B 15.00 1228.00
Graphite Crucible Graphite Crucible (10 Kgs each): 800 Pcs/day 28.00 1034.00
Hand Sanitizer Hand Sanitizer (50 ml size Bolltes):10,000 Bottles/day 31.00 156.00
Particle Board from Wheat... Particle Board (Size 6x3x0.471') : 5,000,000.0 Sq.Mtrs. / Annum 28.00 930.00
Porcelain Insulators Porcelain Insulators : 500.0 MT / day 29.00 2804.00
Methanol from Bio-Waste Methanol from Biowaste:100.0 MT / day 9.00 32721.00
2nd Revised Edition of Th... 0 0.00 0.00
Business Ideas and Opport... 0 0.00 0.00
Manufacturing Opportuniti... 0 0.00 0.00
Production of A4 and A3 S... 0 0.00 0.00
Investment Opportunities ... 0 0.00 0.00
Start Your Own Industry w... 0 0.00 0.00
Battery Sprayer 400 Pcs per day 29.00 110.00
Lemon-Lime Flavoured Soft... 50000 Bottles per day 29.00 700.00
Condoms 500 Boxes per day 28.00 1963.00
Bioplastic Products Manuf... 0 0.00 0.00
Bio-Based and Biodegradab... 0 0.00 0.00
Business Idea of Double E... 0 0.00 0.00
Biodegradable Sanitary Pa... 0 0.00 0.00
Biodegradable Sanitary Pa... 0 0.00 0.00
Manufacturing of Lemon-Li... 0 0.00 0.00
Startup Business Opportun... 0 0.00 0.00
Manufacturing of Pig Iron... 0 0.00 0.00
Biomass Briquettes from B... 20 MT per day 20.00 94.00
Caustic Soda from Limesto... Caustic Soda from Limestone and Sodium Carbonate: 60 MT per day 29.00 827.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 2742 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR